Project Experience
Managed Project Value
Development Experience
Leadership Experience
Countries Reached
Enerpion’s management team has contributed to the development, construction and execution of a diverse portfolio of power generation projects across Europe, the Middle East, North Africa and Central Asia. The experience includes Combined Cycle Power Plants (CCGT), Thermal Power Plants (TPP), Combined Heat and Power Plants (CHP) and Simple Cycle Power Plants (SCPP), covering a broad range of technologies, capacities and equipment suppliers.
| EPC Projects | Technology | Country | Capacity (MW) |
Major Equipment |
|---|---|---|---|---|
| Kırıkkale Diesel Engine Combined Cycle Power Plant | DPP | Turkey | 150 | 11 Wartsila Engines |
| Ayen Ostim Combined Cycle Power Plant | CCGT | Turkey | 35 | GE LM2500 GTG |
| Samra Combined Cycle Power Plant | CCGT | Jordan | 300 | GE 9E GTG + FUJI STG |
| Tynagh Combined Cycle Power Plant | CCGT | Ireland | 400 | GE 109FA Multi-shaft |
| Çumra Sugar Factory Power Plant | TPP | Turkey | 16 | 2 Units of CFB Boiler + SIEMENS STG |
| Isdemir 6&7 Steam Boiler Project | TPP | Turkey | – | 2 Units of Babcock PC Boiler |
| Whitegate Combined Cycle Power Plant | CCGT | Ireland | 450 | GE 109GB Single Shaft |
| Shatura Combined Cycle Power Plant | CCGT | Russia | 400 | GE 109FA Single-shaft |
| Surgut Combined Cycle Power Plant | CCGT | Russia | 800 | GE 109FA Single-shaft |
| Skopje Combined Heat and Power Plant | CHP | North Macedonia | 220 | ALSTOM GT13E2 GTG + ALSTOM STG |
| Riga Combined Heat and Power Plant | CHP | Latvia | 450 | GE9FB GTG + SIEMENS STG |
| Erzin Combined Cycle Power Plant | CCGT | Turkey | 850 | GE 209FB Multi-shaft with SKODA STG |
| Khabat Oil Fired Thermal Power Plant | TPP | Iraq | 300 | Doosan Boilers + SIEMENS STG |
| Hamitabat Combined Cycle Power Plant | CCGT | Turkey | 1200 | SIEMENS 8000H Single-shaft Units |
| Boufarik Simple Cycle Power Plant | SCPP | Algeria | 750 | GE 9FA GTG |
| Kazanskaya Combined Heat and Power Plant | CHP | Russia (Tatarstan) | 390 | GE 9HA.01 GTG |
| Hartha Thermal Power Plant Unit-4 Rehabilitation | TPP | Iraq | 200 | MHPS Boiler + STG |
| Kırıkkale Combined Cycle Power Plant | CCGT | Turkey | 840 | GE 209FB Multi-shaft |
| Riyadh PP13 Combined Cycle Power Plant | CCGT | Saudi Arabia | 1800 | GE 7FA GTG |
| Alba PS5 Combined Cycle Power Plant | CCGT | Bahrain | 1800 | GE 9HA.01 GTG + GE STG |
| Rades C Combined Cycle Power Plant Project | CCGT | Tunisia | 450 | MHPS F7 GTG + MHPS STG |
| Hartha Thermal Power Plant Unit-1 Rehabilitation | TPP | Iraq | 200 | MHPS Boiler + STG |
ENERPION
Selected Power Plant Projects

TYNAGH 400 MW
COMBINED CYCLE POWER PLANT
Location
Galway, Ireland
Client
Tynagh Energy Ltd.
Configuration
1 + 1 / 1 x 400 MW GE 9FA
Completion Date – 2006

HARTHA 400 MW
OIL-FIRED POWER PLANT UNIT-4 REHABILITATION
Location
Hartha, Iraq
Client
Ministry of Electricity (JICA)
Configuration
1×200 MW
Completion Date – 2018

RADES C 500 MW
COMBINED CYCLE POWER PLANT
Location
Rades, Tunisia
Client
STEG (JICA Financed)
Configuration
1+1 MHPS F4
Completion Date – 2020

ALBA PS5 1800 MW
COMBINED CYCLE POWER PLANT
Location
Manama, Bahrain
Client
Aluminium Bahrain B.S.C.
Configuration
3 x (1 + 1) GE 9HA.01
Completion Date – 2019

HARTHA 200 MW
OIL-FIRED POWER PLANT UNIT-1 REHABILITATION
Location
Hartha, Iraq
Client
Ministry of Electricity (JICA Financed)
Configuration
1×200 MW
Completion Date – 2020

KHABAT 300 MW
OIL-FIRED THERMAL POWER PLANT
Location
Khabat, Iraq
Client
Posco E&C
Configuration
2×150 MW Oil Fired Thermal
Completion Date – 2018

BOUFARIK 750 MW
SIMPLE CYCLE POWER PLANT
Location
Boufarik, Algeria
Client
Sonelgaz
Configuration
3 x GE 9 FA
Completion Date – 2018

HAMITABAT 1200 MW
COMBINED CYCLE POWER PLANT
Location
Kırklareli, Türkiye
Client
Limak
Configuration
2 x (1+1) Single Shaft Siemens SGTS-8000H
Completion Date – 2018

KAZANSKAYA 390 MW
COMBINED HEAT AND POWER PLANT
Location
Tatarstan, Russia
Client
Open Joint Stock Comp. TGC-16
Configuration
390MW / 1x GE 9HA.01 GTG + HRSG CHP
Completion Date – 2017

KIRIKKALE 853 MW
COMBINED CYCLE POWER PLANT
Location
Kırıkkale, Türkiye
Client
İç Anadolu Doğalgaz Elektrik A.Ş
Configuration
2+1 / 1 x 853 MW GE 9FB
Completion Date – 2016

PP13 1800 MW
COMBINED CYCLE POWER PLANT
Location
Riyadh, Saudi Arabia
Client
SEC
Configuration
2 x (3+1) GE 7FA
Completion Date – 2018

ERZIN 870 MW
COMBINED CYCLE POWER PLANT
Location
Hatay, Türkiye
Client
Egemer Elektrik Üretim A.Ş.
Configuration
2+1 / 1 x 870 MW GE 9FB
Completion Date – 2014

RIGA 450 MW
COMBINED HEAT AND POWER PLANT
Location
Riga, Latvia
Client
Latvenergo
Configuration
1 + 1 / 1 x 450 MW GE 9FB
Completion Date – 2013

SURGUT 800 MW
COMBINED CYCLE POWER PLANT
Location
Surgut, Russia
Client
OGK-4
Configuration
2 x (1+1) / 2 x 400 MW GE 9FA
Completion Date – 2011

WHITEGATE 450 MW
COMBINED CYCLE POWER PLANT
Location
Cork, Ireland
Client
Bord Gais Eireann
Configuration
1+1 / 1 x 450 MW GE 9FB
Completion Date – 2010

SHATURA 400 MW
COMBINED CYCLE POWER PLANT
Location
Moscow, Russia
Client
OGK-4
Configuration
1+1 / 1 x 400 MW GE 9FA
Completion Date – 2010

SKOPJE 220 Mwe / 160 MWth
COMBINED HEAT AND POWER PLANT
Location
Skopje, North Macedonia
Client
TE – TO AD Skopje
Configuration
1+1/1×220 MW Alstom GT13 E2
Completion Date – 2011

SAMRA 300 MW
COMBINED CYCLE POWER PLANT
Location
Zarqa, Jordan
Client
Samra Electric Power Generating Company
Configuration
2 + 1 / 1 x 300 MW GE 9E
Completion Date – 2006